Comprehensive Plan as a zoning guide
Commissioners clashed over whether filling an older commercial building with an ice cream plant helps or hurts the city's new vision for Baker Boulevard as a walkable, mixed-use hub. The debate turned on whether redevelopment will ever come to this odd, small 'sandwich' lot — and whether saying yes now locks in the status quo.
Booth Calloway Road reconstruction funding
The big $17.2M rebuild of Booth Calloway got its county funding deal approved — $5.8M from Tarrant County's bond programs, redirected from the Glenview project. Design and construction timing depend on federal funding decisions coming in August.
Utility rate increases from Fort Worth
Fort Worth is raising the city's water purchase cost 15% and wastewater 18%. Staff will bring back a rate ordinance update so the utility fund doesn't run a deficit — expect residents to see changes on their water bills.
Adoption of 2024 International Codes and 2026 National Electrical Code
The city is still on 2018 codes and plans to adopt the 2024 ICC codes with regional amendments by October — covering new construction, sprinkler thresholds, carbon monoxide detectors, and lithium battery storage. Existing homes aren't forced to upgrade unless they do major remodels.
Cecil Drive street reconstruction
Cecil Drive scored poorly in the survey and will get a full rebuild — road, water and sewer — designed now with bids in August and construction starting in September.
Aging city IT network replacement
The city's 16 network switches — some dating to 2018 — are aging out of support, and replacing them piecemeal would cost roughly $99,000 up front. Staff propose a Meter "network as a utility" subscription at about $27,118 a year for five years, covering hardware, monitoring, firewalls and Wi-Fi with free upgrades. Council wants longer-term pricing and a cost comparison before signing anything.
Citywide Landscape Services Contract
Council members said the city looks "trashy" along the freeway approaches and want a beautification program, more frequent mowing and litter pickup, and screening like berms and trees.
Emergency access gates on Leslie Drive and Norma Lane
The council got preliminary quotes ($11,347–$18,000) for emergency access gates behind the Leslie Drive and Norma Lane neighborhoods, letting fire and police open them only via Knox lock. Some members dislike the chain-link style and want resident input and privacy slats.
Police Staffing and Retention
The police traffic unit is frozen because of vacancies, cutting traffic stops and arrests. Chief Sylvester laid out recruitment challenges — two academy candidates hired, one officer leaving for Bedford — and a compensation market study is planned, with officers citing pay and Social Security-tax-free TMRS benefits as key factors.
Citywide street conditions and paving priorities
The new AI street survey scored Richland Hills pavement 48/100, with the worst roads — Cecil, Mimosa Park, Ruth Road — concentrated on the south side. Council wants the maps public so residents understand costs and why the sales tax measure matters.
Water and Wastewater Rate Ordinance Revision
Water and wastewater bills are going up as step two of a four-year rate plan — about 5% on base fees and a 38.7% jump in the wastewater volume rate over 2,000 gallons. Heavy water users feel it most, but the city says the average bill rises only a few percent and winter averaging shields summer yard watering.
FY27 Street Mill and Overlay Program
The street sweeper program isn't delivering — council discussed dropping it after paying $10,000 for disappointing results. Public Works also plans a smaller roller (under $30,000) so crews can do better pothole repairs without a CDL driver.
Falling Taxable Values and TAD Appraisal Concerns
Upcoming legislative proposals could cap all city revenue growth at 3.5% and make it easier to roll back tax rates — a big threat to how Richland Hills pays for police, water, and streets.
FY 2027 Development Corporation Budget
The Development Corporation's budget funds Rosebud Park improvements and covers the Link subsidy and parks spending, using $567,678 of reserves as sales tax revenue lags.
Fiscal Year 2027 CCPD Budget
The board reviewed the proposed $1.16 million budget for the Richland Hills Development Corporation, which funds local economic development, business support, and park upgrades. The plan uses some existing fund balance to cover planned community investments.
TIRZ Number One termination
The council seems ready to dissolve the Baker TIRZ, unlocking about $1 million and redirecting ~$350,000 a year citywide instead of limiting it to Baker Boulevard projects.
Tree-Trimming Compliance and Public Safety Access
After fire trucks couldn't get down some streets, the city sent over 200 notices requiring limbs trimmed to 13.5 feet over rights-of-way. Council discussed whether public works or a contractor could help residents — especially elderly or health-limited folks — comply during the summer heat, with a proposal due at the August 24 meeting and no citations until then.
IT Infrastructure Replacement Package
The city's network gear is at or past end of life. The council chose to buy Fortinet equipment and Dell servers outright (about $596,000 total) instead of a seven-year Meter subscription that would have cost roughly $306,000 for the network alone, saving money and keeping the city from paying for monitoring twice.
Five-Year Capital Improvement Program
Staff pitched a data-driven scoring system — nine weighted criteria including public safety (25%) and regulatory compliance — to rank capital projects objectively. A framework resolution comes back June 22, with the full five-year CIP up for a vote in late July.
City Strategic Plan and Budget Direction
Sales tax is tracking about $1.5 million under what was budgeted, so staff is planning a lean FY2027 with conservative revenue assumptions and will likely revisit the TIF transfer and the de minimis tax rate to build cushion. Budget line-item reviews with individual council members begin this summer.
Street Project Funding Reallocation: Glenview vs. Booth Calloway
The city is asking Congress for $6 million to rebuild Booth Callaway Road and replace utilities — the street literally splits two congressional districts, which staff see as a plus.
Ending the Real Time Transport Program
About 11-14 residents — some with intellectual disabilities — use the city-subsidized ride service each month, at roughly $25 per ride and over $5,000 monthly. Council set a hard stop date of July 24, 2026, and staff will personally deliver notices with alternative options like Catholic Charities.
Pausing Safe Routes to School Funding
The $1.1 million local match for the Safe Routes to School grant is on hold because the state-administered construction agreement came in much higher than expected, and sales tax revenue has dropped. Staff will try to push the project out a few years so the grant isn't lost.
Public Beautification and Art Advisory Committee
A new advisory committee is being formed to oversee the ~$30,000 library mural grant and future public art; appointments come at the next meeting.
General Municipal Election Canvass — Council Places 3 and 5
Allison Barger and Athena Campbell were formally declared elected to the council, with Campbell narrowly unseating incumbent GW Estep. New members will shape council decisions going forward.
Proposition A — Sales Tax Reauthorization for Street Maintenance
Voters will decide May 2 whether to reauthorize the three-eighths-cent street sales tax, which brings in about $1.5 million a year for street and sidewalk repairs. A no vote means the city loses that money for at least a year before it can go back on a ballot.
Economic Development Strategic Plan
A draft plan lays out how the city could attract restaurants, retailers and destination development — using opportunity zones, tax credits, corridor beautification, and possibly a voter-approved bond and homestead exemption. It goes public for comment before any adoption.
Economic development and the triangle/Design District idea
Council and staff floated a Dallas-style design district along Handley-Ederville and redeveloping the 12.5-acre CVS corner triangle, which now generates only ~$143,000/year. One building there could add about $1 million a year in sales tax.
Glenview street project possibly paused
The Glenview reconstruction could cost $5 million in city funds; the city manager asked whether a cheaper mill-and-overlay could work instead while revenues are weak.
Code enforcement funding
A council member called code enforcement "important and urgent" and praised Chief Sylvester's new follow-up reports, saying staff need more money to actually abate problem properties.
Fire department staffing losses
The fire department already lost five people and is losing more — including two going to Tarrant County ESD 1 and paramedic Lainea Ashley-Nolen, who is leaving for Wise County EMS. The new chief is hiring replacements and counting on neighboring cities for mutual aid.
Substandard property order — 7056 Dover Lane (Case 10175)
The city has an outstanding order covering repair, vacation, relocation of occupants, removal, demolition, or securing of a substandard house at 7056 Dover Lane. The board was scheduled to hear the latest status update in a public hearing. Neighbors may be concerned about blight and safety at the property.
City Manager Appointment
Richland Hills has a new city manager: Jason Moore, the person who runs day-to-day city operations. That means he’ll have a big say in city services and budgets, so his priorities will shape how local government works.
Fire Chief Appointment
Richland Hills picked Wes Rhodes as its new fire chief. That means he’ll shape how the city responds to fires and emergencies, so residents have a new person in charge of a core public-safety service.