Top issues during term (17)(Roads)
Westgate Drive signal synchronization
Federally funded at $609,335, but the city pays 100% of any cost overruns.
Railroad Street crossing fix with STC
The city's half is roughly $30,000.
18th Street repaving
Cost to be determined through competitive bidding.
Citywide Pavement Condition Assessment
Up to $334,000 for materials, with staff returning for more funding if the added 10th Street section exceeds budget.
Sugarcane Drive road closure hurting small business
Business owner reports about 80% sales loss during the three-week closure.
Interstate 2 frontage road flooding between Texas Boulevard and Westgate
Costs not yet determined; possible detention pond purchases and developer requirements under discussion.
Boundary Road Paving Partnership with Mercedes
No dollar amount set; costs will be split per project under the framework.
Mid-Valley Airport drainage project
Funded by the $8 million legislative appropriation; specific costs for this phase not yet set.
Hospital Service Road naming
None; the city will not maintain the private road.
Westgate & 18th intersection study
Up to $54,900 for the study.
Pike & VoTech roundabout and traffic congestion
No local match required; $5.4 million requested from federal funds.
Cemetery culvert safety hazard
Cost estimates were gathered from vendors but not finalized.
Traffic Safety on 10th and 11th Streets (Jolene Subdivision)
Speed bumps, sidewalks, and warning lights would cost city funds not yet estimated.
18th Street and Milanos Road intersection safety
Up to $28,725 under the on-call engineering contract.
Neighborhood Street Paving Near Library
Up to $200,000 combined.
6th Street and Airport Drive traffic congestion
Adds $15,114.03, bringing the total signal contract to $437,976.03.
Pike Road reconstruction
Design costs up to $166,550.80 from 2025 bond proceeds; construction bidding expected around May 14.